PERMINATOR @ GRADE BEAM EXTENDED UNDER SLAB

PERMINATOR @ THICKENED SLAB

PERMINATOR BASE OF ELEVATOR PIT (FLUSH WALL TO SLAB) (MEL-ROL TRANSITION)

PERMINATOR BASE OF ELEVATOR PIT (MEL-ROL TRANSITION)

PERMINATOR BASE OF WALL TRANSITION TO MEL-ROL (FLUSH WALL TO SLAB)

PERMINATOR COLUMN BASE- N.S.S ABOVE COLUMN BASE (ABOVE WATER TABLE)

PERMINATOR COLUMN BASE- N.S.S ON COLUMN BASE (ABOVE WATER TABLE)

PERMINATOR COLUMN BASE- S.S ON GRADE (ABOVE WATER TABLE)

PERMINATOR HORIZONTAL PIPE PENETRATION

PERMINATOR MEMBRANE PENETRATION CLUSTER (LESS THAN 1 INCH SEPERATION) (MUD SLAB)

PERMINATOR N.S.S @ GRADE BEAM SLAB EDGE (ABOVE WATER TABLE)

PERMINATOR PILE CAP- S.S ON GRADE (ABOVE WATER TABLE) 2

PERMINATOR PILE CAP- S.S ON GRADE (ABOVE WATER TABLE)

PERMINATOR PILE CAP- S.S ON GRADE @ SLAB EDGE (ABOVE WATER TABLE)

PERMINATOR TRANSITION TO PRECON @ BLINDSIDE WALL BASE

PERMINATOR UNDERSLAB TERMINATION